HomeServicesProjectsAdviceAboutContact
Advice ยท Glossary

Building terms, in plain English.

A quick glossary of the words builders, architects and surveyors use, translated.

Permitted development (PD)
Work you can carry out without a full planning application, within set limits.
Lawful Development Certificate (LDC)
An official confirmation that work is lawful under permitted development. Useful proof when you sell.
Building Regulations
The rules that govern how a building is constructed, for safety and performance. Signed off by building control.
RIBA stages
The Royal Institute of British Architects' plan of work, breaking a project into numbered stages from brief to handover.
Groundworks and substructure
Everything below ground and up to floor level: foundations, drainage and slabs. The superstructure is everything above.
First fix and second fix
First fix is the work hidden in walls and floors (pipes, cables, framing). Second fix is the visible finishing (sockets, doors, skirting).
Damp proof course (DPC)
A barrier built into walls to stop moisture rising up from the ground.
Screed
A smooth, level layer laid over a floor, often over underfloor heating, ready for the final finish.
Steel beam (RSJ)
A steel support used to carry the load when a wall is removed or a large opening is formed.
U-value
A measure of how much heat a building element lets through. Lower is better.
Fabric first
The principle of insulating and sealing the building well before adding heating and renewable technology.
MVHR
Mechanical ventilation with heat recovery: supplies fresh air while recovering heat from the air it removes.
Provisional sum
An allowance in the costs for work that is not yet fully defined, adjusted once the detail is known.
Prime cost (PC) sum
An allowance for an item you have not yet chosen, such as tiles or a kitchen, to be selected later.
Contingency
Money set aside for the unexpected, usually 10 to 15 per cent, especially on older buildings.
Variation
A change to the agreed works during the build, priced and recorded so the budget stays clear.
Snagging
The list of small fixes and finishing touches identified near the end of a project.
Practical completion
The point at which the work is finished and the home can be used, even if minor snags remain.
Retention
A small percentage held back for a period after completion, released once any snags are put right.
Defects liability period
A set period after completion during which the builder returns to fix any defects that appear.
Party wall
A legal process for work that affects a wall or boundary shared with a neighbour.
JCT contract
A standard form of building contract from the Joint Contracts Tribunal, widely used to set out terms fairly.

Everyday site language

And here is the language you will actually hear on a building site, from the ground up.

Groundwork & structure

Footings
The concrete base that spreads a building's load into the ground.
Strip foundation
A continuous strip of concrete beneath a load-bearing wall.
Trench fill
A foundation trench filled almost to the top with concrete, quicker than laying blocks below ground.
Raft foundation
A single reinforced concrete slab supporting the whole building, used on weaker ground.
Hardcore / MOT Type 1
Crushed stone compacted to form a firm base under slabs and driveways.
Blinding
A thin layer of sand or weak concrete over hardcore to give a clean, level surface.
Damp proof membrane (DPM)
A plastic sheet laid under a floor slab to stop moisture rising.
Blockwork
Walls built from concrete blocks, often the inner leaf of a wall.
Cavity wall
A wall built as two leaves with an insulated gap, or cavity, between them.
Wall ties
Metal ties that hold the two leaves of a cavity wall together.
Lintel
A beam over a door or window opening that carries the load above.
Padstone
A strong block that spreads the load where a beam bears onto a wall.
Wall plate
A timber along the top of a wall that the roof or joists sit on.
Acrow prop
An adjustable steel prop that temporarily supports a structure during works.

Roof & carpentry

Joists
The horizontal timbers or steels that carry a floor or ceiling.
Noggins
Short timbers fixed between joists or studs to stiffen them.
Rafters
The sloping timbers that form a pitched roof.
Purlin
A horizontal beam that supports the rafters part-way up their span.
Roof trusses
Factory-made triangular frames that form the roof structure.
Battens
Thin timber strips fixed across the rafters to carry tiles or slates.
Ridge
The horizontal line along the very top of a pitched roof.
Hip and valley
A hip is an external roof angle; a valley is the internal gutter where two slopes meet.
Eaves
The lowest edge of a roof, where it meets the wall.
Verge
The edge of a roof at a gable end.
Soffit and fascia
The fascia is the board along the eaves that the gutter fixes to; the soffit is the underside board behind it.
Flashing
Metal, usually lead, that weatherproofs the joint where a roof meets a wall or chimney.
Studwork (stud wall)
A non-load-bearing internal wall built from a timber frame and plasterboard.

Walls & finishes

Render
A cement or lime coat applied to external walls.
Scratch coat
The first, keyed coat of render or plaster that the top coat sticks to.
Dot and dab
Fixing plasterboard to a wall with dabs of adhesive.
Skim
The thin, smooth finishing coat of plaster.
Self-levelling compound
A liquid screed that flows out flat to level a floor.
Beading
Metal or plastic strips that form neat, straight edges and corners in plaster.
Chasing out
Cutting channels into a wall to run cables or pipes.
Boxing in
Building a neat casing to hide pipes, wires or beams.
Making good
Repairing and finishing the surrounding surfaces after work is done.
Reveal
The side face of a window or door opening.
Cill (sill)
The bottom ledge of a window opening.
Architrave
The moulding around a door or window frame.
Skirting
The board along the bottom of a wall where it meets the floor.

People, plant & paperwork

Site manager (foreman)
The person running the day-to-day work on site.
Subcontractor
A specialist firm brought in for part of the work, such as roofing or electrics.
Wet and dry trades
Wet trades use water-based materials (bricklaying, plastering, screeding); dry trades do not (carpentry, dry lining).
Trade nicknames
A chippy is a carpenter, a sparky an electrician, a brickie a bricklayer.
Setting out
Marking the exact positions of walls and features before building begins.
Datum
A fixed reference point that every level on site is measured from.
Plumb, level and square
Truly vertical, truly horizontal, and at a true right angle. The basics of good building.
Muck away
Removing spoil and waste from site.
Back-fill
Replacing soil around new foundations or drainage once the work is done.
Toolbox talk
A short on-site safety briefing before work starts.
RAMS
Risk Assessment and Method Statement: the health-and-safety paperwork for a task.
Day works
Work charged by time and materials rather than at a fixed price.
Programme
The project schedule. The critical path is the chain of tasks that sets the finish date.
Heard a term you are not sure about?

Ask us anything.

We are happy to explain the process in plain language, with no jargon and no pressure.

Call01252 757 177
Emailjohn@hankleyhomes.com
Get in touch